HomeTECH logo feel fresh bidet

HI-2000 - HI2001
Installation Instructions

arrow
arrow
arrow
arrow
arrow
arrow
arrow Customer Bidet Support
arrow Bidet Registration

Started

(Read all instructions before you begin)

(Click on Graphics to Enlarge)

Follow these steps:
  • If you lack electrical or plumbing experience you should have a professional install the bidet.
  • Unpack the bidet
  • Tools Required: Pliers, Wrench, and Straight Slot Screwdriver

Caution:

  • The operational water pressure range required is between 10-100 Pound Per Square Inch (PSI). If the pressure is low the water stream pressure of the shower will be affected.
  • Do not turn on the water or power until installation is complete.
HI-2000 Step 1: Loosen the nuts on the mounting bolts and remove the toilet seat assembly.
HI-2000 Step 2: Slide the new bolts into the bolt guide slots on the bottom side on the main unit.
HI-2000 Step 3: Place the two bolts into the toilet bowl holes and push the main unit to let the inner guide touch the toilet bowl. Fasten with packing "B" and units.
HI-2000 Step 4: Shut off water supply valve (located at the bottom of the wall). Flush the toilet to empty water tank. Remove the water hose from the bottom of the water tank (Ball Cock).
HI-2000 Step 5: Attach T connector (provided) to the bottom of the water tank. Teflon tape is not required for installation. Keep all connections aligned and do not over tighten, as this may damage connections.
HI-2000 Step 6: Connect water hose to T connector (7/8" threaded side).
HI-2000 Step 7: Connect Flexible water hose (provided) from T connector (1/2" threaded side) to system external water tank located under the control panel.
Trial Operations After you have completed the above steps it is time to test the operation of the bidet.
HI-2000 Completed Installation

Note: The Bidet System will automatically shut off after 5 minutes of use. Press "Bidet On", "Wash On", or "Dryer" button to continue use.

HI-2000 1. Action:
  • Open on the shutoff valve and check for water leaks.
  • Control Panel lights will turn on when system is plugged in.
HI-2000 2. Action:
  • Maintain pressure near the junction of the lid and seat to operate the following trial.
HI-2000 Trail Operation
  • Click the graphic to review the testing procedure.
  • Open the water shut off valve and plug in unit.
  • Press the "{Wash" or "Bidet" button while pressing down right side of the seat for about 45 seconds.
  • Water has filled lines and tank when the nozzle start to extend.
  • The dryer function will stop automatically after 5 minutes.
HI-2000

Washing and Adjusting functions

(Click graphic for Instructions)

 

Home | Contact Us | Privacy Policy | Legal | Copyright | Sitemap